2009 Important Due Dates

Fall 2009 (Dates on PDF)

All Majors Except Civil & Mechanical Engineering
September 4
Submit work address on-lineby
November 18
Co-op Report, Addendum, Employer Evaluation (blue form) to Faculty Advisor
January 26
Student Evaluation (yellow form) and copy of Employer Evaluation to Co-op Office
January 26*Pick up graded copy of report from Faculty Co-op Advisor
*Subject to Faculty Advisor's Schedule
Reports must be postmarked by the due date to be considered on time.
EXCEPTIONS: Industrial Engineering reports must be received by the due date.

Civil & Mechanical Engineering
All the above due dates except the following:
December 2
Co-op Report, Addendum, Employer Evaluation & Student Evaluation to Faculty Advisor & Co-op Office.
*Subject to Faculty Advisor's Schedule
Reports must be postmarked by the due date to be considered on time.

All Engineering Students
November 18
Print out and have Supervisor fill out Employer Assessment of Academic Preparation

Summer 2009 (Dates on PDF)

All Majors except Civil & Mechanical Engineering
June 5Submit work address on-line by
July 24
Co-op Report, Addendum, Employer Evaluation (blue form) to faculty advisor
September 11
Student Evaluation (yellow form) and Copy of  Employer Evaluation to Co-op Office
September 11*Pick up graded copy of report from Faculty Co-op Advisor
*Subject to Faculty Advisor's Schedule
Reports must be postmarked by the due date to be considered on time.
EXCEPTIONS: Industrial Engineering reports must be received by the due date.

Civil & Mechanical Engineering
All the above due dates except the following
August 7*Co-op Report, Addendum, Employer Evaluation & Student Evaluation to Faculty Advisor & Co-op Office
*Subject to Faculty Advisor's Schedule
Reports must be postmarked by the due date to be considered on time.

All Engineering Students
August 7
Print out and have Supervisor fill out  Employer Assessment of Academic Preparation